Welcome to Blyvoor Gold



BLYVOOR GOLD (PROPRIETARY) LIMITED (“Blyvoor Gold”) is a gold mining company that is investing in the reconstruction and mining of the Blyvoor Gold Mine (“Blyvooruitzicht”). During 2015 and 2016, Blyvoor Gold negotiated and bought the mining right and certain surface assets. The assets purchased were those considered to be essential to bring the underground and surface tailings retreatment operations back into production. The world class nature of both the underground and surface mineral resources allow for healthy investment returns to be made from the capital investment required to reinstate the operations.


Underground Highlights


+24 000 000 Oz
6 Tailings dams (aka Dumps or Tailings Storage Facilities (TSF’s))
50 years of life
Low technical risk
Underground mine ran profitability for 8 decades
Environmental liabilities fully funded
Fresh environmental impact assessment

Read more about us

Tailings Highlights


Tailings business ran profitability for over a decade
Phase 1 = 35, 000oz per annum
Phase 2 = 50,000oz per annum
Phase 1 = 250,000t per month
Phase 2 = 500,000t per month
SAMREC/JORC – 400koz Measured, 500koz Indicated, Inferred easily, speedily and cheaply upgraded
142, 000, 000 tonnes

Read more about us

Business Basics - Underground


Mineral Resources of 25 000 000 Oz
805 000kg Gold
1kg Gold > R500 000
Year 1 – 20 000 tpm
Year 2 – 30 000 tpm
Year 3 – 40 000 tpm
Hydropower Mining at three times the rate of compressed air
Vacuum Sweepings to increase Mine Call Factor.

Business Basic


Hydro mining (water monitor) using recycled water
Low cost slurry pumping and gravity trench to process plant
Proven cyanide leach with 18 hour “residence time”
Deposition (disposal) on licensed site
Multiple drilling campaigns
Over 60 holes and 3000m of boreholes
4 Independent CPRs: Coffey (2011), Minxcon (2012), AB Global (2016), Whittaker (2019)
Standard flow sheet : TSF Receiving section, Thickening and cyanide leach , Gold precipitation, Calcining of gold, Smelting of gold, Dore gold bars to Rand Refinery, Slime residue pumped to final TSF

Read more about us